EndorsedendorsedCompleted

Browser-Based Visual System for Production Line

Services Covered:

Custom Software DevelopmentWebsite DevelopmentSoftware Maintenance and Support
Project hero — replace with case study imagery
Industry
Industry

Engineering & Manufacturing

Duration
Duration

9 months

Budget
Budget

50K - 199K

Client Size
Start Date

1 May 2021

Team Size
Team Size

1-5 Employees

Engagement Model
Engagement Model

Onshore

Project Capability Score (PCS)

gauge meter
82/100
Strong

Project Capability Score (PCS) estimates how capable Fabrity is of successfully delivering a project like this, based on its past experience, track record, and ability to handle similar work. Learn more about PCS


Client

ABB Sp. z o.o.

map Poland

Project Summary

Fabrity built a browser-based visual system for a manufacturing company to present the new production line data to production workers. The solution stored data on servers, provided application and database support, reduced assembly takt time by 50%, and received positive feedback from production workers.

Key Challenges

  • Construction and commissioning of a completely new production line for electric motors.
  • Provide a visual system to help present and guide production workers on how to assemble implemented products.

Project Deliverables

  • Browser-based dynamic visual system for production workstations
  • Server-side data creation and storage
  • Application and database support (application/database support/maintenance)

Project Solution

Fabrity developed a browser-based dynamic visual system that displays specific production data at worker workstations, built server-side data storage, and provided application/database support. The vendor supplied an account manager as the main contact, an application analyst, and developers (including a Senior .NET developer) and coordinated delivery through regular meetings and UAT cycles.

Project Outcome

  • Assembly takt time on the workstation was reduced by 50%.
  • Production workers gave positive feedback and received necessary information on time.
  • The tool's functionality was proven and appreciated; further cooperation and planned extensions were expected.

Platforms

  • WebWeb

Tech Stack

  • .NET.NET

Client Endorsement

Overall Review Rating

5star5 out of 5 stars

Timeliness

Cost Rating

Willing to Refer

Quality of Deliverables

Thanks to Fabrity's efforts, the assembly Takt time was lessened by 50%. The production workers also gave positive feedback, and the functionality of the tool was appreciated. Overall, the flexible and open-minded team was focused on delivering all the requirements and providing optimum solutions.

Adam Wolski

Project Manager

Note: This endorsement is based on publicly available client feedback from external review sources.

More Projects by Fabrity

Completed
Software Development

Automotive Production Data Web Platform

Preview of the Automotive Production Data Web Platform
Budget:
50K - 199K
Duration:
59 months
Team Size:
6-10

Services Covered:

+3 more
Ongoing
Engineering & Manufacturing

Custom Software Development & Maintenance for Electronics Manufacturer

Preview of the Custom Software Development & Maintenance for Electronics Manufacturer
Budget:
50K - 199K
Duration:
66 months
Team Size:
Confidential

Services Covered:

+1 more