EndorsedendorsedOngoing

MVP Cloud & CI/CD Setup for Automotive IoT Agency

Services Covered:

IoT DevelopmentCloud Consulting and Services
Project hero — replace with case study imagery
Industry
Industry

Automotive

Duration
Duration

79 months

Budget
Budget

Less than 10K

Client Size
Start Date

1 January 2020

Team Size
Team Size

1-5 Employees

Engagement Model
Engagement Model

Nearshore

Project Capability Score (PCS)

gauge meter
68/100
Good

Project Capability Score (PCS) estimates how capable Dinarys GmbH is of successfully delivering a project like this, based on its past experience, track record, and ability to handle similar work. Learn more about PCS


Client

MyMyCars

map Ukraine

Project Summary

An automotive-focused digital agency hired Dinarys GmbH to organize pre-production and production environments for their MVP, including setting up cloud infrastructure and CI/CD. Dinarys designed the architecture, configured GCP services, containerized services with Docker, and implemented CI/CD and monitoring. Their work automated deployment and helped reduce DevOps and developer management time by up to 50%, while accommodating the client’s preferences.

Key Challenges

  • Organize pre-production and production environments for an MVP
  • Create optimal conditions for testing and production
  • Select and configure a cloud provider and its services
  • Set up CI/CD processes and automate deployments
  • Provide end-to-end technical support for multiple future development stages and enable scalability

Project Deliverables

  • Discovery and audit
  • Architecture design
  • Cloud provider setup (GCP/GKE)
  • Dockerized services
  • CI/CD setup (CircleCI, Argo CD)
  • Deployment and MVP release
  • Configuration of third-party services

Project Solution

Dinarys performed discovery and audit, designed the system architecture, selected and configured GCP services (GKE, Cloud SQL/Postgres, Cloud Storage) and Terraform for infrastructure. They containerized services with Docker, set up CI/CD pipelines (CircleCI and Argo CD), deployed the MVP, and configured third-party services and monitoring (Prometheus, Grafana) along with Redis, RabbitMQ, and Elasticsearch to support scaling and automated deployments.

Project Outcome

  • Automated the deployment process
  • Saved up to 50% of DevOps and developer management/operation time
  • Enabled flexible infrastructure management and better conditions for future scaling

Platforms

  • AR/VR/XRAR/VR/XR

Tech Stack

  • PostgreSQLPostgreSQL
  • ElasticsearchElasticsearch

Client Endorsement

Overall Review Rating

5star5 out of 5 stars

Timeliness

Cost Rating

Willing to Refer

Quality of Deliverables

Thanks to the contributions of the Dinarys team, the company was able to automate their deployment process. This allowed their DevOps to save as much as 50% in management and operation time. The company appreciates how the team accommodates their needs and preferences.

Anonymous

R&D Digital Manger

Note: This endorsement is based on publicly available client feedback from external review sources.

More Projects by Dinarys GmbH

Ongoing
E-commerce & Retail

Shopware 6 Migration & Redesign for Wine Business

Preview of the Shopware 6 Migration & Redesign for Wine Business
Budget:
50K - 199K
Duration:
69 months
Team Size:
Confidential

Services Covered:

+1 more
Ongoing
Food & Beverage

Outsourced Engineering & Staff Augmentation for Untamed Cat Food

Preview of the Outsourced Engineering & Staff Augmentation for Untamed Cat Food
Budget:
Confidential
Duration:
21 months
Team Size:
6-10

Services Covered:

+3 more