EndorsedendorsedOngoing

Custom Ad Server and Traffic Management Platform

Services Covered:

Custom Software Development
Project hero — replace with case study imagery
Industry
Industry

Advertising & Marketing

Duration
Duration

70 months

Budget
Budget

10K - 49K

Client Size
Start Date

1 October 2020

Team Size
Team Size

1-5 Employees

Engagement Model
Engagement Model

Offshore

Project Capability Score (PCS)

gauge meter
76/100
Good

Project Capability Score (PCS) estimates how capable Wiser Technology is of successfully delivering a project like this, based on its past experience, track record, and ability to handle similar work. Learn more about PCS


Client

Confidential

mapToronto, Canada

Project Summary

An online advertising agency engaged Bianor to remedy significant traffic loss and limited reporting. Bianor developed a custom ad server and tools, performed meticulous testing and stress simulations, and integrated analytics (Koolreport), reducing traffic loss from 8–9% to under 1% and automating many tasks. The vendor followed a clear action plan and delivered measurable operational improvements.

Key Challenges

  • High traffic loss from third-party solutions (8-9%) impacting profits
  • Limited reporting and inability to customize and handle campaigns at scale
  • Need to reliably distribute millions of ads with parameters like geo-targeting, bids, volume limits and quality fluctuations

Project Deliverables

  • Custom ad server and traffic management system
  • Traffic delivery, latency and click-tracking tests and reports
  • Stress testing and server resource monitoring reports
  • Specialized campaign design tools
  • Integration of Koolreport analytics

Project Solution

Bianor developed a custom system to gain full control over traffic delivery, latency and click tracking, starting with meticulous tests and progressing to software that handles the required traffic volume. They simulated stress tests and monitored server resources to ensure scalability, created specialized campaign design tools to handle complex client requirements, automated many tasks, and integrated Koolreport for analytics reporting. The work was delivered by a small team including a software architect, a PHP developer, a system administrator and a project manager.

Project Outcome

  • Reduced traffic loss from 8-9% to less than 1%.
  • Demonstrated system scalability via stress tests so increased traffic would not overwhelm resources.
  • Automated many operational tasks and improved reporting through Koolreport integration.

Platforms

  • WebWeb

Tech Stack

  • PHPPHP

Client Endorsement

Overall Review Rating

5star5 out of 5 stars

Timeliness

Cost Rating

Willing to Refer

Quality of Deliverables

Thanks to the contributions of the Bianor team, the company was able to formulate a plan that allowed them to take control of their entire situation. The team impressively stuck to this plan with a level of excellence that is difficult to find anywhere in the industry.

Anonymous

CEO

Note: This endorsement is based on publicly available client feedback from external review sources.

More Projects by Wiser Technology

Completed
Software Development

Resource Management Platform Development for Zero Down Time Ltd

Preview of the Resource Management Platform Development for Zero Down Time Ltd
Budget:
50K - 199K
Duration:
6 months
Team Size:
1-5

Services Covered:

+2 more
Ongoing
Software Development

Dev Staff Augmentation for Software Development Company

Preview of the Dev Staff Augmentation for Software Development Company
Budget:
50K - 199K
Duration:
67 months
Team Size:
1-5

Services Covered:

+1 more